The project involved calculating enough A-Gravel to get the site level for a concrete pad. Initially the owner quoted a wood foundation but with road access and a willing cement truck driver we were able to squeeze into the tight space and get the pore done. The concrete finishing, by Murph Dog Concrete to a super smooth finish, completed the pad. With the strong back of a very tall helper and myself, we were able to wrestle this project to completion in four weeks: site prep, forms, pad, walls, rafters, sheathing, trim, windows, doors and metal roof. Owner wanted a work bench and shelves that were prefabbed at the shop then installed.